JOB TODAY logo

Trabajos construction scheduler en Bronxville, New YorkCrear alertas

  • Structural Engineer II
    Structural Engineer II
    hace 17 días
    $85000–$115000 anual
    Jornada completa
    Tarrytown

    MARTOS Engineering is a full-service Structural Design Firm focusing on new building designs and alterations, located 30 minutes from New York City. We are looking for full time Structural Engineers for immediate employment at our Tarrytown, NY office. Candidates must be detail oriented, self-motivated designers looking to expand their knowledge base and experience with a large variety of projects. At MARTOS engineering we strive to mentor new engineers with a variety of projects and responsibilities. Project Types: • Mid-Rise Buildings, • Building Alterations, • Façade Restoration, • Historic Preservation, • Custom Homes, • Underpinning Designs, • Steel Connection / Detailing, • Custom Specialty Stairs, • Historic Barn Conversions, • Existing Condition Evaluations, • Special Inspections Responsibilities: • Perform structural analysis and calculations, • Prepare construction plans, details, and structural notes, • Prepare structural reports, • Review shop drawings, • Perform site investigations and construction inspections, • Coordinate directly with team members, architects, developers and contractors, • Foster relationships with clients and develop new work opportunities, • Mentor junior staff Qualifications: • Bachelor’s Degree in Structural, Civil, or Architectural Engineering with emphasis on Structures., • Proficiency in Auto CAD, • Proficiency in Microsoft Word and Excel, • Engineering-In-Training Certification required Additional Preferred Qualifications: • Knowledge of industry standards and structural codes, • Experience in designing with wood, steel, concrete, and reinforced masonry., • Proficiency with structural analysis programs such as RAM structural systems and STADD Job Type: Full-time Benefits: • 401(k), • 401(k) matching, • Dental insurance, • Family leave, • Flexible schedule, • Flexible spending account, • Health insurance, • Life insurance, • Paid time off, • Parental leave, • Professional development assistance, • Vision insurance Ability to Commute: • Tarrytown, NY 10591 (Preferred) Ability to Relocate: • Tarrytown, NY 10591: Relocate before starting work (Preferred) Work Location: In person

    Sin experiencia
    Inscripción fácil