Plasterer Dry Liner
hace 5 horas
£32 por hora
Jornada parcial
London
Plasterer / Dryliner Required – Ceiling Overboarding + Skim (or Tape & Joint) Scope of Works We require an experienced plasterer/dryliner to complete ceiling overboarding and finishing to a high standard. Option A – Overboard + Skim Finish 1. Fix 25mm high-density acoustic plasterboard to existing plasterboard ceilings. • Boards to be installed level, with joints staggered., • Fixings to be appropriate length for overboarding into joists., • Keep set-out clean and minimise board damage. 1. Joint preparation • Apply paper tape to all board joints., • Ensure joints are properly bedded and flat prior to finishing. 1. Skim plaster finish • Apply skim coat to ceilings, ready for decoration (smooth, consistent finish)., • Protect adjacent finishes and keep the site clean. Option B – Tape & Joint Finish (Alternative to Skim) 1. Fix 25mm high-density acoustic plasterboard to existing plasterboard ceilings (as above)., 2. Tape and joint all board joints, internal angles, and fixings., 3. Finish ready for decoration. Acoustic Detailing • Leave perimeter gaps and penetrations clear for acoustic sealing and coordinate with our team as required., • Do not leave open gaps, cracks, or poorly finished junctions that compromise the acoustic upgrade. Materials / Tools • Boards, screws, tape, plaster, sealants and sundries will be provided., • You must supply your own tools and access equipment as required. Quality Requirements • Ceilings must be flat, true, and free from trowel marks, with clean edges and a consistent finish., • No visible joint lines, ridging, or poor junction finishing., • Good housekeeping throughout and removal of waste as work progresses.