Risk-Informed Design Integration Engineer
hace 3 días
Bellevue
The successful candidate should have proficiency in conducting, reviewing, or supporting methods for technical analyses, including risk assessments, probabilistic risk assessments (PRA), and safety analyses. Review, coordinate, and oversee plant integrated, safety, and risk analyses for their impact